How Much Concrete Do I Need for a Slab? Work It Out in Minutes
Pouring a slab is one of those jobs where getting the maths right before you order saves real money. Order too little and the pour stops halfway, leaving a weak cold joint. Order too much and you have paid for concrete you cannot use.
The good news is that the calculation itself is simple. You only need three measurements: length, width, and thickness.
The formula
Volume in cubic yards = Length (ft) × Width (ft) × (Thickness in inches ÷ 12) ÷ 27
The ÷ 27 step matters because there are 27 cubic feet in one cubic yard, and ready-mix concrete is sold by the cubic yard.
A worked example: a 10 × 10 ft patio slab, 4 inches thick
- Area: 10 × 10 = 100 square feet
- Volume: 100 × (4 ÷ 12) = 33.33 cubic feet
- Cubic yards: 33.33 ÷ 27 = 1.23 cubic yards
Add 10% for waste — spillage, an uneven base, and a slightly deeper spot than planned — and you should order about 1.36 cubic yards, rounded up to 1.5 if your supplier sells in half-yard steps.
Bagged concrete follows the same volume. At roughly 45 × 80 lb bags per cubic yard, 1.23 cubic yards needs about 56 bags, or about 62 bags with the 10% waste allowance (always round bag counts up). The same pour needs about 82 × 60 lb bags, or about 123 × 40 lb bags, with waste included.
If you would rather not do the arithmetic by hand, run the same numbers through a slab concrete calculator — it gives cubic yards, bag counts, truck loads and cost in one step.
Two more common sizes, at 4 inches thick
- 12 × 12 ft shed base: 144 sq ft → 1.78 cubic yards, about 1.96 with waste. About 80 × 80 lb bags, or 88 with waste.
- 20 × 12 ft patio: 240 sq ft → 2.96 cubic yards, about 3.26 with waste. About 133 × 80 lb bags, or 147 with waste.
How thick should the slab be?
Four inches suits most patios, paths and shed bases. Driveways and garage floors that carry vehicles need 5 to 6 inches instead — and that extra thickness changes the volume, so measure the thickness you will actually pour, not the one you wish you had.
One cubic yard covers about 81 square feet at 4 inches thick, which is a useful check: if your answer is far from that, re-check the thickness conversion first.
Bags or ready-mix?
Below about one cubic yard, bags are usually cheaper and easier to handle. Above that, ready-mix is usually cheaper, and a truck carries around 8 to 10 cubic yards. For the 10 × 10 example above, either route works; for the 20 × 12 patio, ready-mix is the sensible choice.
Before you order
- Measure length and width twice, in feet.
- Decide the thickness — 4 inches for a patio, 5–6 inches for a driveway.
- Work out cubic yards, then add 10% waste.
- Confirm bag counts or the ready-mix volume with your supplier, and round up, never down.
Get those four steps right and the pour itself becomes the easy part.